JL WRANGLER Order Codes

wayoflife

Administrator
Staff member
For those of you who have ordered a Jeep JL Wrangler and would like to know where it is in the build process, your dealer can provide you with status codes and the following codes will help you to understand what they mean.

UnscheduledBX – good order available for scheduling[FONT=&quot]
[/FONT]

[FONT=&quot]BB – fleet order only – review by bid department[/FONT]
[FONT=&quot]BD – special equipment processing[/FONT]
[FONT=&quot]BE – edit error – coding error which must be corrected before order can be scheduled[/FONT]
[FONT=&quot]BG – order has passes edit but cannot be scheduled regardless of sold status[/FONT]
Reason CodesF – finance hold – automatic cancellation after 15 days[FONT=&quot]B – model or option build out[/FONT]
[FONT=&quot]L – material restriction[/FONT]
[FONT=&quot]M – material hold (fleet)[/FONT]
[FONT=&quot]ZA – canceled order[/FONT]
ScheduledC – tentative schedule[FONT=&quot]D – firm schedule: serial number assigned, approx time in station – 5 days[/FONT]
[FONT=&quot]D1 – gateline: unit sequenced for production, est ship date assigned, Approx time in station – 12 days[/FONT]
BuildE – framing[FONT=&quot]F – paint[/FONT]
[FONT=&quot]G – trim[/FONT]
Built[FONT=&quot]I – unit built, pending final inspection[/FONT]
[FONT=&quot]J – vehicle passed final inspection but not released to carrier[/FONT]
[FONT=&quot]JB – shipped to body vendor[/FONT]
[FONT=&quot]JE – shipped to emissions[/FONT]
[FONT=&quot]JJ – consigned to body vendor[/FONT]
[FONT=&quot]JS – shipped to storage[/FONT]
[FONT=&quot]KZ – released by plant and invoiced[/FONT]
Traffic CodesKZ L – released but not shipped KZ M – first rail departure[FONT=&quot]KZ N – first rail arrival[/FONT]
[FONT=&quot]KZ O – delayed/received[/FONT]
[FONT=&quot]KZ OA – plant hold, quality audit[/FONT]
[FONT=&quot]KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted[/FONT]
[FONT=&quot]KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error[/FONT]
[FONT=&quot]KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold[/FONT]
[FONT=&quot]KZ OE – misdropped or misshipped vehicle[/FONT]
[FONT=&quot]KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed[/FONT]
[FONT=&quot]KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction[/FONT]
[FONT=&quot]KZ OH – all other “O” type carrier codes[/FONT]
[FONT=&quot]KZ T – second rail departure[/FONT]
[FONT=&quot]KZ U – second rail arrival[/FONT]
[FONT=&quot]KZ X – delivered to dealer[/FONT]
[FONT=&quot]KZ Y1 – major damage – must not be sold as new[/FONT]
[FONT=&quot]KZ Y2 – major damage – vehicle sold at auction[/FONT]
 

Top